[1]
Ridwan, A. 2020. Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project. JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN. 11, 1 (Sep. 2020), 35–53. DOI:https://doi.org/10.30649/japk.v11i1.61.