Ridwan, A. (2020). Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project. JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN, 11(1), 35–53. https://doi.org/10.30649/japk.v11i1.61