RIDWAN, A. Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project. JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN, [S. l.], v. 11, n. 1, p. 35–53, 2020. DOI: 10.30649/japk.v11i1.61. Disponível em: https://pdp-journal.hangtuah.ac.id/index.php/jurnal/article/view/61. Acesso em: 21 dec. 2025.