Ridwan, A. (2020) “Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project”, JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN, 11(1), pp. 35–53. doi: 10.30649/japk.v11i1.61.