[1]
A. Ridwan, “Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project”, JAPK, vol. 11, no. 1, pp. 35–53, Sep. 2020.