Ridwan, A. “Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project”. JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN, vol. 11, no. 1, Sept. 2020, pp. 35-53, doi:10.30649/japk.v11i1.61.