Ridwan, Ahmad. “Project Acceleration Analysis Using the Crashing Method With The Addition of Four Hours of Work and The Shift Work System Case Study : RSUB Malang Building Construction Project”. JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN 11, no. 1 (September 1, 2020): 35–53. Accessed December 21, 2025. https://pdp-journal.hangtuah.ac.id/index.php/jurnal/article/view/61.