Analysis of Ship Manning in the Crewing Department in Preventing Crew on Board Delays at PT. Pelayaran Andalas Bahtera Baruna Jakarta
DOI:
https://doi.org/10.30649/japk.v15i2.145Keywords:
ship manning, crewing department, crew on board delayAbstract
The crew is the main element in running the ship's operations. It is important to procure or dispatch crew members. However, crew dispatch has a relatively long and drawn-out process and often crew members do not follow the process according to schedule, causing delays. This research is a qualitative study that aims to determine the causes of crew on board delays. Data collection in this study used interviews, observation, and documentation methods. The results of this study indicate that there are obstacles in the ship's crew process. From the results of data analysis, the causes of crew on board delays are due to several factors, namely delays in certificate revalidation, difficulty in finding candidates according to qualifications, and sudden changes in crew requests. Efforts that can be made in overcoming this delay problem include giving a statement letter and sanctions if you do not follow existing procedures.
References
Hasibuan. (2008). Manajemen sumber daya manusia. Jakarta: PT. Bumi Aksara.
Rikietrianto. (2014). Proses rekrutmen dan seleksi. Diakses dari http://rikietrianto.blogspot.com/2014/06/pengertian-proses-rekrutmen-dan-seleksi.html pada tanggal 10 Oktober 2019.
Peraturan Menteri Pe$rhubungan Republik Indone$sia Nomor PM 84, 2013 tentang, Perekrutan dan Penempatan Awak Kapal, Jakarta.
Peter Yenni. (2002) . Analisis adalah penguraian ( online ) . Diakses dari http://pengertianplua,blogspot.com/201B/01/pengertian-analisis.html pada tanggal 10 Oktobe$r 2019
Sugiyono. (2013). Metode$ penelitian bisnis (pendekatan kuantitatif, kualitatif, dan R&D) Bandung: CV. Alfabe$ta
Sudjadmiko, F.D.C. (1995). Pokok-Pokok Pelayaran Niaga. Jakarta: PT. Gunung Agung.
Peraturan Menteri Perhubungan (Permenhub) No. 26 Tahun 2022 tentang Pengawakan Kapal.
Ke$putusan Menteri Perhubungan Nomor KM 70 tahun 1998 tentang Pengawakan Kapal Niaga.
Undang-Undang tentang Pelayaran, UU Nomor 17 Tahun 2008.
Peraturan Menteri Perhubungan Republik Indone$sia, SOP Penerbitan Pengawakan (Minimum Safe$ Manning Document).
PT. Pelayaran Andalas Bahtera Baruna Jakarta diakses dari https://www.abbaruna.com/
KM 70 tahun 1998 Pasal 1 tentang Pengawakan Kapal Niaga. “Penerbitan Sertifikat Pengawakan (Safe Manning Certificate)” di Direktorat Perkapalan dan Kepelautan, Kementrian Perhubungan.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Fauzi Alwi Yasin, Beni Agus Setiono, Didik Purwiyanto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.




