Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT)

Authors

  • Ahmad Ridwan Universitas Islam Lamongan

DOI:

https://doi.org/10.30649/japk.v15i2.160

Keywords:

project time management, critical path method (CPM), program evaluation and review technique (PERT)

Abstract

This study aims to examine the application of the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) in optimizing project time management. The research method used is a literature study by analyzing various scientific references related to CPM and PERT. The results show that CPM is effective in identifying the critical path of a project that directly impacts project duration, while PERT excels in managing project time uncertainty through a probabilistic approach. The analysis indicates that combining both methods can enhance the accuracy of project time planning, minimize delay risks, and ensure optimal resource utilization. The conclusion of this study is that CPM and PERT have their respective advantages in project time management, and their simultaneous application can be an effective strategy for achieving project objectives more efficiently. Therefore, project managers are advised to understand the project characteristics and select the appropriate method to optimize project time management.

References

Churil Azizah, M. R. S., & Turis, I. J. (2024). Time Management Analysis Using the PERT Method in Housing Development Projects. Jurnal RIPCULL: Jurnal Teknik Sipil UNIMUDA Sorong. Retrieved from https://unimuda.e-journal.id/jurnalripcull/article/view/5492

Febrian Sinurat, & Misdalena, F. (2024). Analisis Manajemen Proyek dengan Metode Critical Path Method (CPM) pada Proyek Pembangunan Gedung Chandra Tanjung Karang. Jurnal Konstruksi. Retrieved from https://jurnal.itg.ac.id/index.php/konstruksi/article/view/2131

Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (12th ed.). Wiley.

Meredith, J. R., & Mantel, S. J. (2018). Project Management: A Managerial Approach (9th ed.). Wiley.

Novitasari, E., & Wijayaningrum, T. (2025). Time Management Analysis Using the CPM and PERT Methods on the Jogja-Solo Toll Road Construction Project. Journal of Applied Statistics and Data Mining. Retrieved from https://journal.itesa.ac.id/index.php/jasdm/article/view/68

PMI. (2021). A Guide to the Project Management Body of Knowledge (PMBOK Guide) (7th ed.). Project Management Institute.

Qordhowi, A. F. Y. A., & Kurniawan, M. W. (2025). Analisis Manajemen Waktu Menggunakan Metode CPM pada Proyek Pembangunan Poliklinik Terpadu RSUD Prof. Dr. Soekandar Mojosari. Jurnal Teknik Industri Terintegrasi (JUTIN). Retrieved from https://journal.universitaspahlawan.ac.id/index.php/jutin/article/view/36104

Sahril. (2022). Analisis Manajemen Waktu Menggunakan Metode CPM dan PERT pada Proyek Pembangunan Jalan Tol Pekanbaru-Bangkinang. Repository Universitas Islam Riau. Retrieved from https://repository.uir.ac.id/10538

Downloads

Published

26-05-2025

How to Cite

Ridwan, A. (2025). Optimizing Project Time Management Using the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT). JURNAL APLIKASI PELAYARAN DAN KEPELABUHANAN, 15(2), 354–361. https://doi.org/10.30649/japk.v15i2.160